自组织团队是敏捷团队的资产。一旦团队是自组织就取得了敏捷战役的一半的胜利。下面哪一项描述的不是组织的本质?
用户挑战记录
选择了: Team talk to each other and commit the times lines to Scrum Master 团队成员之间彼此直接对话,并且为SM承诺时间
登录后查看详情
选择了: Team talk to each other and commit the times lines to Scrum Master 团队成员之间彼此直接对话,并且为SM承诺时间
登录后查看详情
选择了: Self-organizing team manage all their work,delivery and challenges by themselves 自组织团队管理他们的所有工作,并且进行交付
登录后查看详情
选择了: Work assignment is based on pull mechanism where team member doesn’t wait for manager to allocate work rather picks by own and plan it 工作分配基于拉动的一种机制,而不是等待经理分配任务
登录后查看详情
选择了: Team talk to each other and commit the times lines to Scrum Master 团队成员之间彼此直接对话,并且为SM承诺时间
登录后查看详情
选择了: Team talk to each other and commit the times lines to Scrum Master 团队成员之间彼此直接对话,并且为SM承诺时间
登录后查看详情
选择了: Team talk to each other and commit the times lines to Scrum Master 团队成员之间彼此直接对话,并且为SM承诺时间
登录后查看详情
选择了: Team talk to each other and commit the times lines to Scrum Master 团队成员之间彼此直接对话,并且为SM承诺时间
登录后查看详情
选择了: Team talk to each other and commit the times lines to Scrum Master 团队成员之间彼此直接对话,并且为SM承诺时间
登录后查看详情
选择了: Team talk to each other and commit the times lines to Scrum Master 团队成员之间彼此直接对话,并且为SM承诺时间
登录后查看详情
相关题目
- 一家公司的管理团队希望雇佣一名资源,来管理对公司现有产品的软件升级。该产品是某个部门多个产品的其中一个产品,且该部门还有其它重要活动。那么应该选择下列哪一个候选人来管理软件更新?
- 在项目收尾期间,发现一个问题,但在这个阶段,该项目的资源已经解散。在解散资源之前,项目经理应该事先做什么?
- 在项目过程中,发生了一个意外。该事件影响了项目成本,但是未影响到时间。该事件之前被项目团队识别为一项潜在风险。若要限制该事件对于项目成本的影响,项目经理应该怎么做?
- 您被要求生产一个10米长的管,并且您正在生产12.1米,11.98米,12.12米,12.08等范围内的管。这意味着:
- 在规划中,项目团队识别到一个质量不合格风险,并为这个风险准备了一份行动计划。若要避免项目执行过程中的不合格,项目经理应进行下列哪一项?
推荐
想要系统学习?查看我们的 模拟试卷